Shelter

Mitchell Eley Gould Architects, Holt, 2022

 

Subscribe now to instantly view this image

Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.

Already a subscriber? Sign in

GC7U7ZEV2H8AQ5R_1922_Holt_Housing_7 

Photos by Jake Joseph Richardson     Download Original

  • GC7U7ZEV2H8AQ5R_1922_Holt_Housing_7    
  • GC7U7ZEV2H8AQ5R_Photo_07-02-2022_13_51_19    
  • GC7U7ZEV2H8AQ5R_Photo_07-02-2022_13_51_25    
  • GC7U7ZEV2H8AQ5R_Photo_07-02-2022_13_45_35    
  • GC7U7ZEV2H8AQ5R_Photo_07-02-2022_13_44_30    
  • GC7U7ZEV2H8AQ5R_ALBS100_Bus_Shelter_Plan_REV_F    
  • GC7U7ZEV2H8AQ5R_ALBS200_Bus_Shelter_Elevations_REV_C    
  • GC7U7ZEV2H8AQ5R_ALBS500_Bus_Shelter_AXO_Views_REV_B    
  • GC7U7ZEV2H8AQ5R_ALBS300_Bus_Shelter_Section    
  • GC7U7ZEV2H8AQ5R_ALBS400_Bus_Shelter_Visual_REV_B    

In response to the Holt Parish Council’s need for an improved bus stop, Mitchell Eley Gould have delivered a uniquely crafted shelter, designed to reflect the heritage of the village, its site and situation.

The architectural proposal reflects the associated housing and commercial development, using materials that draw from the industrial heritage of the village. The resulting scheme seeks to identify a key focal point for the meeting and wayfinding, expressed in the oversized roof and warm interior materiality.

Data

  • Begun: May 2021
  • Completed: Feb 2022
  • Floor area: 11m2
  • Sector: Public realm
  • Total cost: £15,000
  • Funding: Private
  • Tender date: May 2021
  • Procurement: Direct as the client is the contractor
  • Address: Holt, BA14, United Kingdom

Professional Team

Suppliers