Westonbirt Green Woodworking Shelter
Subscribe now to instantly view this image
Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.
Already a subscriber? Sign in
Invisible_Studio_Pearce-D07LO5PPDT6FT66D07LO5PPDT6FT66_20231013_woodworking_shelter_0341
Photos by Davis Butler Download Original
The project aimed to build an innovative green woodworking shelter at Westonbirt Arboretum
Using timber grown and milled on site, complementing a pre-existing community shelter by Xylotek and Invisible Studio. Merging traditional green oak framing with advanced CNC fabrication, it exemplified modern green timber construction. Traditional arboretum practices were blended with contemporary methods, creating a precedent for sustainable architectural design using unprocessed green timber in a contemporary structure. The green woodworking shelter is a six-meter diameter structure with six raw tree limb legs and a triangular, green oak superstructure with stainless-steel flitch plates. Some 85 varied-angled holes were drilled and chiseled into the main frame, with each accommodating a 60x60mm green oak pole – each one set at a bespoke angle and individually lengthened accordingly to hold the domed roof across a series of slender columns. The poles were slotted and wedged into the holes, then hammered into the mainframe to secure them in place. Aluminum shingles, riveted over the pole ends, created a waterproof monocoque shell roof. This project combined traditional, green timber construction with advanced digital fabrication, thereby streamlining the traditional, multi-layered shingle method for a double-curved form. Hemispherical washers were used to adapt to the movement inherent in the drying of green timber, and the structure itself acted as both the final structure and formwork for the curving roof. Over 10 months, the design was developed through iterative concept, prototyping and fabrication stages, allowing for responsive, on-site design evolution, even in the final build. This enabled the waste reduction and the pioneering of a flexible cladding connection for drying green timber.
Data
- Begun: Aug 2023
- Completed: Oct 2023
- Floor area: 40m2
- Sector: Arts and culture
- Total cost: £35,000
- Funding: Forestry Commission
- Tender date: Mar 2023
- Procurement: JCT Intermediate
- Address: Westonbirt Arboretum, Tetbury, United Kingdom
Professional Team 
- Architect: Invisible Studio
- Client: Forestry Commission
- Structural engineer: Lean Structrures
- Main contractor: Pearce +