Lowther Primary School
Subscribe now to instantly view this image
Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.
Already a subscriber? Sign in
Tim Soar (website) Download Original
Rebuild and refurbishment to double the capacity of the primary school from single-form entry to two-form entry
Phase two of the school redevelopment doubled the size of the school through the construction of a new-build two-storey extension.
This second phase puts the shared dining hall at the heart of the school while the upper classrooms are assigned to students in their final year.
A library and resource centre mark the entrance and point of transition.
Phase one added a new extension to the east that to replaced an ageing nursery building and included reorganising the entrance and administration spaces while creating flexible community facilities.
Data
- Begun: Sep 2011
- Completed: Sep 2012
- Floor area: 1,085m2
- Sector: Education
- Total cost: £2.5M
- Procurement: Design & Build
- Address: Stillingfleet Road, Barnes, London, SW13 9AE, United Kingdom
Professional Team 
- Architect: Patel Taylor
- Client: London Borough of Richmond upon Thames
- Contractor's architect: Penton Architects
- Structural engineer: Rolton Group
- Structural engineer: Stroud Associates
- M&E consultant: Rolton Group
- M&E consultant: REL
- Quantity surveyor: EC Harris
- Acoustic consultant: Sound Space Design
- Project manager: EC Harris
- Main contractor: Lakehouse Contracts
- CDM coordinator: EC Harris
- Approved building inspector : London Borough of Richmond upon Thames
AJBL Sponsor
Thrislington Cubicles
Builders of the worlds best toilet cubicles, vanity units, lockers and panels at our factory in the United Kingdom since the 1960s