Coach House Bermondsey

Giles Reid Architects, London, 2022

 

Subscribe now to instantly view this image

Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.

Already a subscriber? Sign in

UZFK92Q0L6SRPNH_PHOTO_1_Ståle_Eriksen_25_LR 

Photos by Ståle Eriksen     Download Original

  • UZFK92Q0L6SRPNH_PHOTO_1_Ståle_Eriksen_25_LR    
  • UZFK92Q0L6SRPNH_PHOTO_2_Ståle_Eriksen_15_1_LR    
  • UZFK92Q0L6SRPNH_PHOTO_4_Ståle_Eriksen_18_LR    
  • UZFK92Q0L6SRPNH_PHOTO_5_Ståle_Eriksen_21_LR    
  • UZFK92Q0L6SRPNH_PHOTO_6_Ståle_Eriksen_30_LR    
  • UZFK92Q0L6SRPNH_PHOTO_8_Ståle_Eriksen_17_LR    
  • UZFK92Q0L6SRPNH_PHOTO_9_Ståle_Eriksen__03_LR    
  • UZFK92Q0L6SRPNH_PHOTO_10_Ståle_Eriksen__10_1_LR    
  • UZFK92Q0L6SRPNH_PHOTO_11_Ståle_Eriksen__09_5_LR    
  • UZFK92Q0L6SRPNH_PHOTO_13_Ståle_Eriksen__11_LR    
  • UZFK92Q0L6SRPNH_first_LR    
  • UZFK92Q0L6SRPNH_ground_LR    
  • UZFK92Q0L6SRPNH_Tiles    
  • UZFK92Q0L6SRPNH_4_1    
  • UZFK92Q0L6SRPNH_cupboard_9    

The project was to convert two floors of an 18th C coach house in Bermondsey.

The major constraint was the lack of direct sunlight. The building was free standing when the client first bought the property. However, over the past twenty years, the building has been progressively built out on all sides. We relocated the living room to the upper level, where there was the best available natural light. The kitchen was moved into what had been a small laundry area, allowing the creation of one big family space. Bedrooms were moved to the ground floor. They face a narrow courtyard which backs onto a neighbouring glass curtain wall, providing reflected light. External walls, formerly shot blasted brick, dark brown and light absorbing, were given a lime / sand slurry and painted white to bounce the light around. Exposed timber and steel beams were fire protected and also painted white. Pale white ash was used throughout for both flooring and built-in joinery.

Data

  • Begun: Jan 2021
  • Completed: Sep 2022
  • Floor area: 145m2
  • Sector: House
  • Total cost: £345,000
  • Funding: Private
  • Tender date: Jul 2020
  • Procurement: JCT Minor Works
  • Address: London, SE1, United Kingdom

Professional Team