The Opera Rehearsal Room

Selencky Parsons Architects, London, 2021

 

Subscribe now to instantly view this image

Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.

Already a subscriber? Sign in

8DBNTIV96H4ZR92_01 

All photographs Richard Chivers     Download Original

  • 8DBNTIV96H4ZR92_01    
  • 8DBNTIV96H4ZR92_02    
  • 8DBNTIV96H4ZR92_03    
  • 8DBNTIV96H4ZR92_04    
  • 8DBNTIV96H4ZR92_05    
  • 8DBNTIV96H4ZR92_06    
  • 8DBNTIV96H4ZR92_07    
  • 8DBNTIV96H4ZR92_08    
  • 8DBNTIV96H4ZR92_09    
  • 8DBNTIV96H4ZR92_10    
  • 8DBNTIV96H4ZR92_01_Site    
  • 8DBNTIV96H4ZR92_02_Plan    
  • 8DBNTIV96H4ZR92_03_Front_Elevation    
  • 8DBNTIV96H4ZR92_04_Side_Elevation    
  • 8DBNTIV96H4ZR92_05_Section    

The Opera Rehearsal Room has been built as part of a wider project commissioned by the Amar Frances Foster Jenkins Trust.

The charity converted a large house in north London into accommodation for the postgraduate students it supports. Many of these students are opera singers or répétiteurs who can’t find suitable rehearsal space. This led to the creation of a design brief for a rehearsal space to be provided as a jewel-like pavilion in the garden of the property.

The key drivers for the building were how it responded to its site and how it performed acoustically. This led to the form of the building being composed from a rectangular volume with opposing corners pulled down to create an asymmetric internal volume. This minimises parallel internal surfaces ideal for the acoustics while also generating a massing that respects the neighbouring gardens and a diagonal ridge that aligns with the main axis of the house. The building is then constructed from an inner and outer shell that are physically separated to prevent noise transfer.

The primary structure of the building is formed from a series of timber glulam frames that are acoustically insulated from the external shell. Internally the exposed glulam structure helps to break up the surfaces of the walls to further improve the acoustic performance. The outer shell is clad with bronze anodised panels, which sit on a grey brick base.

A series of bronze fins align with the internal exposed glulam structure to provide a visual link between the interior and exterior while giving the elevations depth and interest. These materials were chosen to provide a highly engineered external appearance to the building that would honour its crisp geometry

Data

  • Begun: Jan 2020
  • Completed: Apr 2021
  • Floor area: 30m2
  • Sector: Arts and culture
  • Total cost: £216,000
  • Funding: Charity funded
  • Tender date: Feb 2019
  • Procurement: JCT intermediate
  • CO2 Emissions: 400kg/m2/year
  • Address: 34 Exeter Road, Kilburn, London, NW2 4SB, United Kingdom

Professional Team