Monang Pre-school
Subscribe now to instantly view this image
Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.
Already a subscriber? Sign in
design_build_studio-9Y2LT9R2ACNS0CC9Y2LT9R2ACNS0CC_Space_Images-38_EDIT_reduced
Photos by Earl Abrahams Download Original
Monang Pre-School is the twelfth project of the design/build studio; at the University of Nottingham.
The studio asks students to design and build a small social-impact architecture project each year. Starting each September – students design proposals and develop fundraising in support of the project. A shortlist is selected in December, which is shared with studio partners, the pre-school committee, and the head teacher. An on-site community meeting reviews the proposal in February and over six weeks in April and May the students travel to site and construct the project in its entirety. Over the last 15 years the design/build studio has become embedded in the local communities around Hanertsburg South Africa – maintaining relationships with several head teachers and our long-time partners the Thusanang Trust and Education Africa. In the UK the studio is supported by London based practices Studio 8Fold and Grimshaw. Monang pre-school was undertaken by 44 undergraduates, 3 postgraduates, 6 industry partners, and 13 studio staff. Monang Pre-school was designed to the brief set by the Department for Basic Education, Limpopo. The site presented design challenges, overcome with pile foundations and steel beam foundations. The pre-school includes 2 large classrooms, a sick-bay, an office, a kitchen and secure storage areas. The studio included photovoltaic lighting, USB charging and a rainwater harvesting system as well as several fruit producing trees. The substantial outdoor deck nearly doubles the formal space, functioning as an outdoor classroom. The pre-school is led by head teacher Rose Molepo who has been running a pre-school since 2001. The new building will allow the pre-school to register as an official early childhood development (ECD) provider, making them eligible for government subsidised childcare funding.
Data
- Begun: Apr 2023
- Completed: May 2023
- Floor area: 157m2
- Sector: Education
- Total cost: £50,258
- Funding: charitable donations from: Our students; Grimshaw Architects; Studio 8Fold; Justin Dillingham, in memory of Jennie Underwood BSc 1987-1990
- Tender date: Oct 2022
- Procurement: charitable project managed by the University of Nottingham
- Address: Ga-Molepo Limpopo South Africa, United Kingdom
Professional Team 
- Architect: University of Nottingham
- Client: Monang Preschool; Thusanang Trust
- Structural engineer: Price and Myers; Steve Wickham, Lois Plaistow
- QS: design/build studio students
- Planning consultant: design/build studio
- Main contractor: design/build studio
Suppliers
- Foundations: DC construction
- Roofing: Norther Roofers
- Sub contractor: Builders warehouse
- Timber: J Wahlen Timber