The Box
Subscribe now to instantly view this image
Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.
Already a subscriber? Sign in
fca02_cross02_8200a
Fletcher Crane Architects worked closely with CrossFit 2012 to establish their new premises at Imber Court Sports Club, Esher, Surrey.
The proposal gained planning consent within the greenbelt by utilising the space under an existing rugby grandstand. Situated beneath a unique steel-framed structure and stepped concrete seating, the insertion houses open gym spaces, changing rooms and front of house facilities including a tea/juice bar.
Orientated directly east-west, the Box benefits from even northern light filtered through milky corrugated roof lights, whilst the facing elevations are constructed from simple stud work, and clad in polycarbonate panels. The extruded lineal space, amalgamated by a black rubber floor, create distinct zones for the varying activities involved in the sport including rope climbs, gymnastic rings and muscle ups.
Externally, the whole structure is sheathed in bitumen corrugated roofing whilst all internal walls are clad voluminously in economical plywood, emphasising the rhythmical kit-part host structure. The tectonics of the sports equipment and exposed services add a final layer to the architectural anatomy of the internal environment ensuring a raw, robust and uncompromising aesthetic.
The project relied heavily upon sheet materials, economies of scale and deliverability by local contractors. A distinct entry is carved into the extrusion and contributes to the natural ventilation strategy. This realisation of the Box, is the just the start of a comprehensive vision for the CrossFit company; an enabling base for international competitions prevalent in the USA.
Photography by Nick Kane
Data
- Begun: Feb 2019
- Completed: Jul 2019
- Floor area: 390m2
- Sector: Sports and leisure
- Total cost: £196,000
- Funding: Private
- Tender date: Dec 2018
- Procurement: Letter of intent
- Address: CrossFit 2012, Imber Court Sports Club, Ember Lane, East Molesey, KT8 0BT, United Kingdom
Professional Team 
- Architect: Fletcher Crane Architects
- Client: CrossFit 2012
- Structural engineer: Galbraith Hunt Pennington Ltd
- QS: Adair Associates
- Main contractor: Phinesse Ltd
Suppliers
- Selected subcontractors and suppliers: Surrey Steel Supply & Fit