Housing at Golspie Street and Shaw Street
Subscribe now to instantly view this image
Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.
Already a subscriber? Sign in
Andrew Lee (website) Download Original
Terrace and infill that complete the perimeter of a dense urban block
These buildings complete the block to create a courtyard, where safe, supervised play and informal meeting is encouraged on South orientated paths and greened spaces.
In a re-interpretation of the tenement typology the terrace places one flat to either side of a common landing, with large amounts of glazing at the street and courtyard edges to allow sunlight to penetrate through the building.
A neutral brick forms the background and plinth with alternating raised modules in black rainscreen cladding, while projecting pods create a play of shadow and colour on the facade, accommodating dining spaces and providing a unique identity to each home.
Data
- Begun: Feb 2010
- Completed: Mar 2012
- Floor area: 11,186m2
- Sector: Residential
- Total cost: £11.9M
- Address: Golspie Street, Glasgow, G51 3BH, United Kingdom
Professional Team 
- Architect: DO-Architecture
- Client: Govan Housing Association, Cruden Estates
- Structural engineer: Scott Bennett Associates
- Quantity surveyor: Reid Associates
- Acoustic testing: Robin Mackenzie Partnership
- Ecohomes assessment: Ramboll
- CDM coordinator: Brown + Wallace
- Main contractor: Cruden Building and Renewals