Cummins Engine Company Factory
Subscribe now to instantly view this image
Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.
Already a subscriber? Sign in
Roof vents both ventilate smoke and allow warm air to escape in summer
Peter Cook/View (website) Download Original
Manufacturing facility with high levels of flexibility and close integration between management offices and production areas
Heavy engineering plant for assembly of diesel and natural gas generator sets with high levels of flexibility and close integration between management offices and production areas
The office component, which also houses a staff restaurant, sits on the higher, front portion of the site on entry. Behind it, on a reduced level, but under the same roof, is a large production facility of 12,000m2.
The lower service areas are screened by this change in levels. The 3,000m2 office component rises to three storeys. As the manufacturing space is situated under the same triple barrel vaulted roof, the volume in which the production space sits can be clearly envisaged.
The factory itself is relatively square: 96.4m wide x 104m long. Material enters near the front of the factory's side elevations, to enter the production lines, which are laid out perpendicular to the office zone. At the rear of the factory are the specialist testing cells from where the generators leave the building after the testing process.
Data
- Begun: 1996
- Completed: 1998
- Floor area: 12,000m2
- Sector: Industrial
- Total cost: £7.7M
- Address: Columbus Avenue, Ramsgate, CT12 5BF, United Kingdom
Professional Team 
- Architect: Bennetts Associates
- Project architect: Rab Bennetts
- Client: Cummins Engine Company
- Project manager: Buro Four
- Structural engineer: Whitby Bird and Partners
- M&E Services: Ernest Griffiths and Son
- Fire consultant: Arup Fire
- Acoustic consultant: Arup Acoustics
- Planning supervisor: WSP Consulting Engineers
- Main contractor: Tarmac Building
- Clerk of Works: Mears Associates
Suppliers
- Wall cladding: Paragon Cladding
- Production area concrete floor: Precision Concrete Floors
- Rooflight supplier: Duplus Domes
- Flat panelling: Precision Metal Forming