Fourth Floor, 24 Lever St, Manchester

re|form architects, Manchester, 2010

 

Subscribe now to instantly view this image

Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.

Already a subscriber? Sign in

Mural at dusk 

re|form architects & The Neighbourhood     Download Original

  • Mural at dusk    
  • Resource space    
  • Design studio    
  • Main meeting room    
  •     
  • Refectory    
  • Visual separation of new and existing construction    
  • Bespoke lighting solution    
  • Bespoke ductwork installation for power & data containment    
  • Plan    
  • Sections    
  • Sections    
  • Perspective    
  • During construction    
  • Detail resolution    
  • Main studio, mural wall construction    
  •     
  • During stripout phase    
  • Partition details    
  • Ducting detail    
  • Kitchen details    

Conversion and refurbishment of Grade II listed former textile warehouse to provide creative design studios

The space had been damaged by fire in an adjacent building, which oddly enough had probably saved many of its original features from developer destruction. The building had consequently lain empty for some years and had caught the eye of ‘The Neighbourhood’ as a potential new location for their growing creative studio.

Refurbishment of the space included the removal of non-original partitions and stripping back the original floors. New insertions were clearly defined; with a suite of meeting rooms inserted and a bespoke zinc clad kitchen installed relating to the pattern of the original t&g cladding, evoking memories of packing cases and the buildings previous use as a textile warehouse
IT servicing is critical to the Neighbourhood’s business operation, and a bespoke system was developed from standardised ducting components to distribute the power and data cabling, which reduced costs, and simplified construction without sacraficing aesthetics.

Data

  • Begun: Aug 2010
  • Completed: Nov 2010
  • Floor area: 395m2
  • Sector: Office
  • Tender date: Jun 2010
  • Procurement: Integrated within lease agreement
  • CO2 Emissions: -kg/m2/year
  • Address: The Neighbourhood, Fourth Floor, 24 Lever Street, Manchester, M1 1DZ, United Kingdom

Professional Team