Minehead EYE

Mark Kingsley Architects, Somerset, 2010

 

Subscribe now to instantly view this image

Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.

Already a subscriber? Sign in

View from northwest 

Collingwood Photography (website)     Download Original

  • View from northwest    
  • Colourchanging facade from northwest    
  • Entrance view    
  • View of hall from balcony    
  • BMX skate ramps in hall    
  • Interior view of colourchanging facade    
  • Cafe with views of double-height hall    
  • Recording studio    
  • Staircase following colour scheme    
  • Thrislington WC cubicles in green hues    
  • Colourchanging facade from northwest    
  • Colourchanging facade from northwest    
  • Colourchanging facade from northwest    
  • Colourchanging facade from northwest    
  • Colourchanging facade from northwest    
  • Site plan    
  • Ground floor plan    
  • First floor plan    
  • Roof Plan    
  • Section A-A    
  • Section C-C    
  • Wall section H-H    
  • Wall section K-K    

Skate park and youth centre housed in a two storey building, sited to the south of the Mart Road Regeneration Area

The centre is split into two main sections, a double-height multi-purpose arena, which is used as a skate park, and a youth centre with cafe area. The building also includes a multi-media suite, rehearsal space, recording studio and exhibition space.

A glazed doorway and projecting canopy mark the building's entrance. The transparent and layered first floor polycarbonate façade comes alive at night with the colourchange LED lighting. Throughout the interiors and exteriors of the building, an orange and green colour palette is expressed against a neutral background of white walls and birch plywood timber lining panels.

The superstructure comprised a steel frame with precast planks, providing the clear large spans to the skate park and enabling rapid construction. The centre uses biomass (woodpellet) underfloor heating, and natural ventilation is used throughout.

Data

  • Begun: May 2009
  • Completed: Sep 2010
  • Floor area: 1,226m2
  • Sector: Sports and leisure
  • Total cost: £2.7M
  • Procurement: Two stage traditional/ JCT ICD with contractor's design (revision 1 2007)
  • CO2 Emissions: 24.7kg/m2/year
  • Address: Minehead, Somerset, TA24 5BJ, United Kingdom