Eight-storey facility providing 5,000m2 of technical space on five tenant floors linked to a two-storey generator building
The structure comprises a steel frame with precast concrete floor slabs and structural topping for 15kN/m2 loading. The external envelope has storey-height unitised cladding elements suspended from the floor-slab edge finished with silver folded aluminium composite rainscreen panels with a pixellated pattern of darker panels on stair cores at each end of the building.
The facility is the first data centre development in central London to obtain GLA approval, meeting sustainability criteria set by the government’s Carbon Reduction Commitment, by making available free waste heat at the site boundary for community use.
Data
- Begun: Jan 2009
- Completed: May 2010
- Floor area: 19,200m2
- Sector: Industrial
- Total cost: £80M
- Funding: Design and build
- Procurement: JCT 2005 Standard Form XQ
- CO2 Emissions: 204kg/m2/year
- Address: Telehouse, Coriander Avenue, London, E14 2AA, United Kingdom
Professional Team 
- Architect: YRM
- Client: Telehouse International Corporation of Europe
- Main contractor: Mace
- Structural engineer: AECOM
- Services engineer: WSP Buildings
- Contract administrator: YRM
- Quantity surveyor: Arcadis AYH
- Project manager: Arcadis AYH
Suppliers
- External Doors: Schuco
- Precast concrete floor system: Creagh Concrete
- Raised floor: Bathgate Flooring