Ballifield Primary School - Classroom of the Future

Prue Chiles Architects, Sheffield, 2003

 

Subscribe now to instantly view this image

Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.

Already a subscriber? Sign in

Approaching the classroom 

Martine Hamilton Knight (website)     Download Original

  • Approaching the classroom    
  • Spilling out from the classroom    
  • Approach    
  • Stepping stones    
  • Entrance area    
  • Naturally lit corridor    
  • Bay window    
  • Looking out    
  • Classroom    
  • Cloakroom    
  • Revealing the building    
  • Recycled plastic worktop    
  • Toilets    
  • On the balcony    
  • Location Plan    
  • Ground Floor Plan    
  • First Floor Plan    
  • Section A-A    
  • Section B-B    
  • North Elevation Montage    
  • Internal SKetch    
  • Section    

New entrance to a 1960s primary school incorporating two classrooms and a toilet block built as a result of a major DfES schools design initiative

The new classrooms did not intend to be stand alone prototypes, but rather a proposal developed with close relation to the setting, the existing building and the daily routines of teachers and pupils.

The entrance of the school was reconfigured to allow for universal access and to provide a light, well proportioned space to wait in. Rooflights cast natural light onto the ply walls. There are recessed display alcoves for student work.

The classrooms were designed to embrace new learning tools while allowing children to experience the natural and sensory aspects of their surroundings. A close relationship between the internal and external spaces aimed to encourage the school to expand its learning environment.

The building is clad in larch, painted plywood and planted trellising. Brightly coloured box bay windows allow space for 4-5 children to read with a strong connection to the external classroom.

Data

  • Begun: Oct 2002
  • Completed: Sep 2003
  • Floor area: 248m2
  • Sector: Education
  • Total cost: £340,846
  • Funding: Department for Education and Skills
  • Tender date: Aug 2002
  • Procurement: JCT98, without quantities incorporating sectional completion supplement
  • Address: Ballifield Primary School, Handsworth Grange Road, Handsworth, Sheffield, S13 9HH, United Kingdom

Suppliers

AJBL Sponsor

Armstrong World Industries

A global leader in providing customised, multi material ceiling and wall solutions

Find out more