McLaren Technology Centre
Subscribe now to instantly view this image
Subscribe to the Architects’ Journal (AJ) for instant access to the AJ Buildings Library, an online database of nearly 2,000 exemplar buildings in photographs, plans, elevations and details.
Already a subscriber? Sign in
Night view
Nigel Young Download Original
Corporate and production headquarters for the McLaren Group, housing 1000 staff
Roughly semi-circular in plan, the McClaren Technology Centre includes design studios, laboratories, testing and production facilities. A formal lake completes the circular plan and forms an integral part of the building’s cooling system. The principal lakeside facade is a continuous curved glass wall shaded by a cantilevered roof.
Internally, the building is organised around double-height ‘streets’ forming circulation routes and articulating fingers of flexible accommodation. These house production and storage areas at the lower level, with top-lit design studios, offices and meeting rooms above.
A Visitor Centre is located in a separate building at the entrance to the complex. It houses educational facilities, a temporary exhibition space, auditorium and is linked to the main centre by a subterranean building.
Data
- Begun: 1999
- Completed: 2004
- Floor area: 63,000m2
- Sectors: Office, Industrial
- Total cost: £300M
- Tender date: 1998
- Address: Chertsey Road, Woking, GU21 4YH, United Kingdom
Professional Team 
- Architect: Foster + Partners
- Project architect: Norman Foster
- Client: McLaren Group
- Project manager: Arlington Securities
- Structural engineer: Arup
- Services engineer: Schmidt Reuter Partner
- Quantity surveyor: Davis Langdon
- Planning and Landscape: Terence O'Rourke
- Environmental engineer: WSP Development
- Lighting consultant: Claude Engle
- Services contractor: Amec
- Main contractor: Kier